Crafti: Craft Project Planner is a lifestyle app developed by Daniel Kim.
User Ratings
The app has no ratings yet.
App Information
Crafti: Craft Project Planner is freely available from the App Store. The app size is 81.59 MB. The latest version available is 1.0.4. The last update was on July 24, 2026.
Technical Requirements
The app has a content rating of Everyone. The app has been available on the App Store since May 2026.
Crafti: Craft Project Planner is made and published by
Daniel Kim.
AppBrain is an independent app data site and isn't affiliated with Daniel Kim.
The app name, icon, screenshots and description belong to Daniel Kim and are shown as published on the App Store.
Description by Daniel Kim(from the App Store)
Crafti turns the craft tutorials you love into projects you actually finish.
See a knitting pattern on YouTube, a crochet reel on Instagram, a woodworking build on TikTok, or a jewelry idea on Pinterest? Paste or share the link and Crafti's AI instantly pulls out the whole project - the tools and materials, step-by-step instructions, time estimate, and difficulty level - and saves it as a project you can make.
WHY MAKERS LOVE CRAFTI - Import from anywhere: any video or craft blog link becomes a clean, organized project in seconds. - Everything in one place: sort projects into collections, mark favorites, and filter by craft type and difficulty from beginner to expert. - Plan your making time: drop projects onto a weekly, monthly, or list planner and drag to reschedule. - Never buy twice: Crafti auto-builds a shopping list of tools and supplies from your projects and merges duplicates for you. - Make hands-free: follow mode walks you through each step so your hands stay on your work.
BUILT FOR EVERY CRAFT Knitting, crochet, sewing, quilting, woodworking, paper craft, jewelry making, macrame, cross stitch, resin, and every DIY project in between.
FREE TO START Crafti is free to use. Optional Premium unlocks unlimited AI imports for makers who save a lot.
Stop losing tutorials in your bookmarks. Import it, plan it, shop for it, and make it - all in Crafti.
Each subscription will automatically renew 3 days before the expiration date for
the same time period. Subscriptions can be cancelled at any time before the renewal.