Ganttly
1.2.1
Dao Nguyen
5.00
3 reviews
Free
5.00
·
3 reviews
Download from the App Store
About Ganttly
Ganttly is an overall app developed by Dao Nguyen.
Download Statistics
User Ratings
Ganttly is rated 5.00 out of 5 stars. The rating is based on 3 ratings.
App Information
Ganttly is FREE to download. The APK download size is 3.73 MB. The latest version available is 1.2.1. The last update was on March 24, 2026.
Technical Requirements
The app has a content rating of Everyone. The app has been available on Google Play August 2025.
Description
More data about Ganttly
| Price | Free to download |
| Rating | 5.00 based on 3 ratings |
| Ranking | Not ranked |
| Version | 1.2.1 |
| App download size | 3.73 MB |
| Suitable for | Everyone |
Alternative downloads for the Ganttly app
Changelog of Ganttly
No changelog data
Developer information for Dao Nguyen
Dao Nguyen
Address:
Comments on Ganttly for iOS
We don't have enough comments to show example comments. Please check back later.
App Store Rankings for Ganttly
This app is not ranked
Technologies used by Ganttly
Back to top