AppBrain's verdict
- Last updated
- November 23, 2026
- Size
- 23.7 MB
Share ScopeProof: Change Orders
User feedback
Ratings and reviews on the App StoreComments on ScopeProof: Change Orders for iOS
We don't have enough comments to show example comments. Please check back later.
Store listing
By Hugo Lamarre, from the App StoreDescription by Hugo Lamarre Written by the developer, not by AppBrain. Click to read.
Create, send, and sign change orders directly on the job site.
If you're still texting prices, writing notes, or chasing signatures after the work is done — you're leaving money on the table.
---
CREATE CHANGE ORDERS IN SECONDS
Add materials, labor, and credits as simple line items. Enter quantity and price — totals calculate instantly.
• Change orders, scope changes, and signed work approvals
• Materials, labor, and custom items
• Automatic totals (no calculator needed)
• Clean layout your customer understands
• Your own taxes (sales tax, GST, VAT) and numbered change orders
• Contract time, the running contract sum, and a valid-until date
---
GET SIGNED ON THE SPOT
Hand your phone to the customer and capture their signature before you pack up.
• Finger or Apple Pencil
• Customer name, date, and approval recorded
• Your terms shown before they sign, and sealed with the signature
• Signed before you leave the job site
No delays. No chasing approvals.
---
DISPUTE-PROOF YOUR WORK
When the customer says “I never agreed to that” three months later, you need more than a signature.
ScopeProof creates a tamper-evident record:
• Cryptographic hash recorded at signing — any later change is detectable
• GPS coordinates and timestamp on every photo you take
• Photos attached to the signed PDF as evidence, each with your note
• Export a verifiable evidence ZIP — court-ready
When questions come up later, you have everything documented and provable.
---
PROFESSIONAL, BRANDED PDFS
Generate clean, client-ready documents instantly.
• Your logo and company details, in the header layout you choose
• Your website, license, and insurance, with phone, email, and website links your customer can tap
• Line-item breakdown with totals
• Signature and timestamp, with your photos and notes on the pages after
• Ready to send, share, or archive
Look professional on every job.
---
SEND FOR REMOTE SIGNING
Not on-site with your customer? No problem.
Send a link and let them sign from their phone. They see the whole change order first: line items, photos with your notes, and your terms.
The change order and its photos are encrypted end-to-end: the key stays in the link, never on our server, and everything is deleted 30 days after you send it.
• Works in any browser (no app required)
• Get notified when it's signed
• Status updates automatically
• Your customer can request changes instead, and you turn them into a revision
• A reminder when a link goes unanswered
---
BUILT ON REAL JOB SITES
Designed for the truck and the crawl space, not the office.
Perfect for:
• Construction
• Plumbing
• Electrical
• HVAC
• Roofing
• Painting
• Renovation and service work
• Handyman work
---
FREE TO START, PRO ONCE FOR EVERYTHING
Use ScopeProof free for your first 3 change orders.
One-time Pro upgrade unlocks:
• Unlimited change orders, line items, photos, projects
• Remote signing via link
• Your logo and brand color on PDFs (no watermark)
• Four PDF header layouts, plus your website, license, and insurance on every PDF
• Terms your customer signs, and a note on each photo
• Dispute-proof mode + evidence ZIP export
• A deposit due on signing, with your payment link and QR code
• CSV, QuickBooks, and JSON export
Pay once. No subscription. Ever.
---
STOP LOSING APPROVALS
Create it.
Send it.
Get it signed.
All from your phone.
Safety and technology
Found in the app by AppBrain- Price
- Free
- App size
- 23.7 MB
- Content rating
- Everyone
Technologies used by ScopeProof: Change Orders
Releases
Updates seen on the App Store- Version
- 1.3
- Launched
- May 2026
No changelog data
Alternatives
Similar apps and more from Hugo LamarreMore from Hugo Lamarre
Rankings
App Store top chartsApp Store Rankings for ScopeProof: Change Orders
About the app and developer
About ScopeProof: Change Orders
ScopeProof: Change Orders is a business app developed by Hugo Lamarre.
User Ratings
The app has no ratings yet.
App Information
ScopeProof: Change Orders is freely available from the App Store. The app size is 23.75 MB. The latest version available is 1.3. The last update was on November 23, 2026.
Technical Requirements
The app has a content rating of Everyone. The app has been available on the App Store since May 2026.
ScopeProof: Change Orders is made and published by Hugo Lamarre. AppBrain is an independent app data site and isn't affiliated with Hugo Lamarre. The app name, icon, screenshots and description belong to Hugo Lamarre and are shown as published on the App Store.
Developer information for Hugo Lamarre
Address:
Frequently asked questions about ScopeProof: Change Orders
Is ScopeProof: Change Orders free?
Yes. ScopeProof: Change Orders is free on the App Store.
Is ScopeProof: Change Orders still available?
Yes. ScopeProof: Change Orders is on the App Store, and the last update we saw was on November 23, 2026.
How large is ScopeProof: Change Orders?
ScopeProof: Change Orders is 23.75 MB.
Is ScopeProof: Change Orders suitable for children?
App Store rates the content of ScopeProof: Change Orders as suitable for everyone.
Who made ScopeProof: Change Orders?
ScopeProof: Change Orders was developed by Hugo Lamarre. It is listed in the business category on the App Store.
Subscribe now to get full and unlimited access to AppBrain Intelligence. You'll have access to:
- App Intelligence dashboard (performance timeline, competitor comparison, country rankings, insight cards)
- Detailed ranking data per app
- Full timeline per developer
- Device market shares data per country
- Unlimited keyword tracking
- AI assistant access via MCP (Claude, Cursor or any MCP client)
AppBrain is an app data site, we track rankings, ratings, installs for all apps and games on Google Play and the App Store. AppBrain doesn't host app files or APKs, all install links go directly to the official store. All trademarks are owned by their respective owners.
More apps
App statistics
About AppBrain