AppBrain
AppBrain
  • Apps
  • Apps being viewed right now Trending apps today Most popular apps All-time most installed apps Top rated apps iPhone and iPad apps
  • Intelligence ▾
    Intelligence overview → Track any Android app or your whole market
    Track & analyze
    Keyword Tracker & OptimizerTrack & improve Play rankings App Performance ReportOne-off PDF for any app StatisticsFree Android & Play market stats
    Promote your app
    Featured Apps App Links
  • Intelligence
  • Pricing
  • Dashboard
  • Sign up
  • Log in
App Store Apps > Photo & Video > MarkCamera: Time Location
MarkCamera: Time Location icon

MarkCamera: Time Location

2.5.1
浩东 邱
4.50
2 reviews
Free

MarkCamera: Time Location Screenshot 1 of 10
MarkCamera: Time Location Screenshot 2 of 10
MarkCamera: Time Location Screenshot 3 of 10
MarkCamera: Time Location Screenshot 4 of 10
MarkCamera: Time Location Screenshot 5 of 10
MarkCamera: Time Location Screenshot 6 of 10
MarkCamera: Time Location Screenshot 7 of 10
MarkCamera: Time Location Screenshot 8 of 10
MarkCamera: Time Location Screenshot 9 of 10
MarkCamera: Time Location Screenshot 10 of 10
Screenshots by 浩东 邱, from the the App Store listing
View on the App Store

AppBrain's verdict

Rating on App Store
4.50
2 ratings
Last updated
October 28, 2026
Size
18.6 MB

It doesn't have enough ratings yet to judge what users think.

Official page on the App Store

User feedback

Ratings and reviews on the App Store

Comments on MarkCamera: Time Location for iOS

We don't have enough comments to show example comments. Please check back later.

Store listing

By 浩东 邱, from the App Store
Description by 浩东 邱 Written by the developer, not by AppBrain. Click to read.
Watermark Camera - Timestamp & GPS Location Photo Stamper

Professional timestamp camera for work check-in, construction records, field photography and travel logging. Automatically stamps every photo with the real time, precise GPS location and weather, with a tamper-proof design that keeps your records verifiable.

【Why Watermark Camera】
• Tamper-proof: server time + high-precision GPS, cannot be altered
• Smart time: album photos can show the original capture time or the current time
• One-tap stamping: time, address, weather, latitude/longitude, altitude
• 50+ professional templates: work, attendance, travel, parenting
• 30+ filters, video watermarks and batch processing

【Watermark Types】
► Time: real time to the second, date and weekday
► Location: GPS address, coordinates, altitude, editable manually
► Weather: live temperature and conditions, multiple icon styles
► Custom: work notes, project name, company logo, signature

【Template Library】
• Work records: construction progress, material acceptance, quality and equipment inspections
• Attendance check-in: dual time and location verification, flexible-hours friendly
• Parenting growth (New): capture every precious baby milestone
• Lifestyle: travel check-in, food spots, running and fitness
• Brand promotion: events, product showcases, franchise stores

【Built For】
Construction and engineering, property management, field sales, logistics and delivery, insurance claims, municipal enforcement, restaurant chains, home services, attendance management, travel journals, parenting diaries and food exploration.

【Highlights】
• Tamper-proof time and location you can trust
• 50+ scenario templates, updated continuously
• Three simple steps, easy for anyone
• 30+ professional filters for sharp work photos
• Photo and video watermarks
• Batch watermarking from your album
• On-device processing protects your privacy
• Core features free forever

【What's New in v2.3.0】
• New parenting watermark templates for baby growth records
• Album photos let you choose the capture time or the current time
• Remembers your time preference, no need to set it every time
• Smoother overall experience

Download Watermark Camera and make every photo verifiable.

Keywords: watermark camera, timestamp camera, GPS location stamp, work check-in, attendance camera, construction records, field photography, tamper-proof camera, engineering records, property inspection, on-site evidence, travel logging, parenting camera, baby growth record

Privacy Policy: https://yq4x3j7gtp.feishu.cn/docx/Td1qdMF82os063xGoHXcfXH9nqz
Terms of Use: https://yq4x3j7gtp.feishu.cn/docx/XKwSdNJiJoC2kQx2qRNcGi8xnMd

Safety and technology

Found in the app by AppBrain
Price
Free
App size
18.6 MB
Content rating
Everyone

Technologies used by MarkCamera: Time Location

Releases

Updates seen on the App Store
Version
2.5.1
Launched
May 2025

No changelog data

Alternatives

Similar apps and more from 浩东 邱

Alternatives to MarkCamera: Time Location

WhimsyCam icon WhimsyCam
会通 王
0.0
Free
Ruyi Camera icon Ruyi Camera
泽海 黄
0.0
Free
Timestamp Camera-date stamper icon Timestamp Camera-date stamper
晓莲 甄
5.0
Free
3 ratings
SafeMark - Timestamp&Watermark icon SafeMark - Timestamp&Watermark
会通 王
5.0
Free
4 ratings
Timestamp Camera . icon Timestamp Camera .
嘉欣 黎
4.5
Free
124 ratings
Timestamp Camera-Geo watermark icon Timestamp Camera-Geo watermark
深圳市美易网科技有限公司
4.7
Free
18 ratings
Timestamp Camera - Time & GPS icon Timestamp Camera - Time & GPS
Shaanxi Ruidebao Technology Co.,Ltd
4.5
Free
2 ratings
Timestamp Camera Basic. icon Timestamp Camera Basic.
HK SHENGUANGYUAN TECH LIMITED
4.5
Free
48 ratings

More from 浩东 邱

4Q: 4 Quadrants Method icon 4Q: 4 Quadrants Method
浩东 邱
5.0
Free
2 ratings
LockMan icon LockMan
浩东 邱
1.0
Free
1 ratings
Hi ABC icon Hi ABC
浩东 邱
5.0
Free
1 ratings
GlobeTime: WorldClock+Weather icon GlobeTime: WorldClock+Weather
浩东 邱
0.0
Free
Days: Important Dates icon Days: Important Dates
浩东 邱
0.0
Free
TagVideo icon TagVideo
浩东 邱
0.0
Free

Rankings

App Store top charts

App Store Rankings for MarkCamera: Time Location

This app is not ranked

About the app and developer

About MarkCamera: Time Location

MarkCamera: Time Location is a photo & video app developed by 浩东 邱.

What is the rating of MarkCamera: Time Location?

MarkCamera: Time Location is rated 4.50 out of 5 stars, based on 2 ratings.

Is MarkCamera: Time Location free?

MarkCamera: Time Location is free. The app size is 18.62 MB. The latest version available is 2.5.1. The last update was on October 28, 2026.

What are the requirements for MarkCamera: Time Location?

The app has a content rating of Everyone. The app has been available on the App Store since May 2025.

MarkCamera: Time Location is made and published by 浩东 邱. AppBrain is an independent app data site and isn't affiliated with 浩东 邱. The app name, icon, screenshots and description belong to 浩东 邱 and are shown as published on the App Store.

Developer information for 浩东 邱

浩东 邱

Address:

Frequently asked questions about MarkCamera: Time Location

Is MarkCamera: Time Location free?

Yes. MarkCamera: Time Location is free on the App Store.

Is MarkCamera: Time Location still available?

Yes. MarkCamera: Time Location is on the App Store, and the last update we saw was on October 28, 2026.

How large is MarkCamera: Time Location?

MarkCamera: Time Location is 18.62 MB.

Is MarkCamera: Time Location suitable for children?

App Store rates the content of MarkCamera: Time Location as suitable for everyone.

How do people rate MarkCamera: Time Location?

MarkCamera: Time Location scores 4.50 out of 5 stars, from 2 ratings on the App Store.

Who made MarkCamera: Time Location?

MarkCamera: Time Location was developed by 浩东 邱. It is listed in the photo & video category on the App Store.

What are the best alternatives to MarkCamera: Time Location?

People looking at MarkCamera: Time Location also look at these photo & video apps: WhimsyCam, Ruyi Camera, Timestamp Camera-date stamper, SafeMark - Timestamp&Watermark, Timestamp Camera ..

Share MarkCamera: Time Location

Apps other people are watching Top new apps Price drops on Google Play Popular Photo & Video Apps Today's trending apps
WhimsyCam icon WhimsyCam
Ruyi Camera icon Ruyi Camera
Timestamp Camera-date stamper icon Timestamp Camera-date stamper
SafeMark - Timestamp&Watermark icon SafeMark - Timestamp&Watermark
Timestamp Camera . icon Timestamp Camera .
Timestamp Camera-Geo watermark icon Timestamp Camera-Geo watermark
Timestamp Camera - Time & GPS icon Timestamp Camera - Time & GPS
Timestamp Camera Basic. icon Timestamp Camera Basic.
Overview Alternatives Reviews Rankings Technology
AppBrain Intelligence premium content

Subscribe now to get full and unlimited access to AppBrain Intelligence. You'll have access to:

  • App Intelligence dashboard (performance timeline, competitor comparison, country rankings, insight cards)
  • Detailed ranking data per app
  • Full timeline per developer
  • Device market shares data per country
  • Unlimited keyword tracking
  • AI assistant access via MCP (Claude, Cursor or any MCP client)
1 Month

$75/mo
(billed every month)

SAVE 0%
Subscribe
3 Months

$65/mo
($195 billed every 3 months)

SAVE 13%
Subscribe
1 Year

$57.50/mo
($690 billed every year)

SAVE 23%
Subscribe
Each subscription will automatically renew 3 days before the expiration date for the same time period. Subscriptions can be cancelled at any time before the renewal.

AppBrain is an app data site, we track rankings, ratings, installs for all apps and games on Google Play and the App Store. AppBrain doesn't host app files or APKs, all install links go directly to the official store. All trademarks are owned by their respective owners.

More apps

  • Top Android apps being viewed
  • Blessing Lions: Casino Slot Android App
  • CineRush
  • Ethiopian Bible

App statistics

  • Android statistics
  • Google Play Developer stats
  • Trending Android Apps
  • Trending iOS apps
  • Top popular Apps
  • Buy the best Android phone
  • Buy & sell app businesses

About AppBrain

  • Contact
  • Privacy
  • Documentation
  • DMCA takedowns
  • Blog
  • Android app Install tracking and attribution options for the AppBrain ad network
© 2010-2026 - AppBrain