Downloads
Monitor sales. Track food and labor costs. See Guest and Check counts, and more!
Try these apps instead
About Crunchtime Impact
Crunchtime Impact was a productivity app developed by Crunchtime Information Systems, Inc.. It was removed from Google Play Jan 17, 2026 and is no longer available for download.
Download Statistics
Crunchtime Impact had been downloaded 19 thousand times before it became unavailable.
User Ratings
Crunchtime Impact was rated 2.59 out of 5 stars, based on 48 ratings.
App Information
Crunchtime Impact was free to download. The APK download size was 30.29 MB. The last available version was 2.10.0 (894). The last update was on July 12, 2023.
Technical Requirements
Crunchtime Impact required Android 4.3+ or higher. The app had a content rating of Everyone. The app had been available on Google Play since May 2015.
More data about Crunchtime Impact
| Price | Free to download |
| Total downloads | 19 thousand |
| Rating | 2.59 based on 48 ratings |
| Version | 2.10.0 (894) |
| APK size | 30.3 MB |
| Number of libraries | 5 |
| Designed for Android | 4.3+ |
| Suitable for | Everyone |
| Ads | NO ads |
App Performance Report
Get a detailed PDF report for Crunchtime Impact with download trends, rating history, and key performance statistics — useful for competitive research or tracking your own app. Learn more
Get PDF Report — $29More from Crunchtime Information Systems, Inc.
Google Play Rating history and histogram
Downloads over time
Crunchtime Impact has been downloaded 19 thousand times.
Changelog of Crunchtime Impact
Developer information for Crunchtime Information Systems, Inc.
Comments on Crunchtime Impact for Android
Technologies used by Crunchtime Impact
Frequently asked questions about Crunchtime Impact
Is Crunchtime Impact free?
Yes. Crunchtime Impact is free to download from Google Play.
Is Crunchtime Impact still available?
No. Crunchtime Impact was removed from Google Play. We last saw it there Jan 17, 2026.
Does Crunchtime Impact contain ads?
No. Google Play does not list Crunchtime Impact as containing ads.
What Android version does Crunchtime Impact require?
Crunchtime Impact runs on Android 4.3 and higher.
How large is the Crunchtime Impact APK?
The Crunchtime Impact APK is 30.29 MB.
Is Crunchtime Impact suitable for children?
Google Play rates the content of Crunchtime Impact as suitable for everyone.
How many times has Crunchtime Impact been downloaded?
Google Play lists 10,000+ downloads for Crunchtime Impact.
How do people rate Crunchtime Impact?
Crunchtime Impact scores 2.59 out of 5 stars, from 48 ratings on Google Play.
Who made Crunchtime Impact?
Crunchtime Impact was developed by Crunchtime Information Systems, Inc.. It is listed in the productivity category on Google Play.
What are the best alternatives to Crunchtime Impact?
People looking at Crunchtime Impact also look at these productivity apps: Food Cost Calculator, SMART Shift, Schedulefly, 7shifts: Employee Scheduling, Shift4 InCharge.
Back to top